Property Update 10/7/2022

West End Baptist Church has enjoyed meeting on Sundays in the Hilton Greenville, but we are excited about having our own space soon! We’ve been talking about landscaping, interior signage, furniture, and more lately; making final decisions and placing orders. Some have been talking about decorating for Christmas, if all goes as planned. 

Here’s the progress report from WM Jordan:

PROGRESS TO DATE

  • AFD Construction completed the ceiling grid adjustments in the Sanctuary.
  • Johnson Electric trimmed out light fixtures throughout and assisted with permanent power turnover.
  • Duke Energy completed the power line relocation and turned on permanent power.
  • Thomas Mechanical tied in the refrigerant power to the outdoor units, trimmed out diffusers, and tied in AH’s 1 and 2.
  • Raby Construction worked on the change order work for the playground area – storm and grading.
  • Trailer and temp fence were removed as we prepare to wrap up exterior work.
  • Southwest Sound measured for acoustic panels.

Please continue to pray for everyone involved in making our move back to the West End. Thank you for your support!

back of WEBC new building showing canopy for the drop-off area
Parking drop-off area with canopy installed
Raby Construction - Installing storm line and yard drain for playground area
Large multi-purpose room ceiling
AFD Construction - Multi-purpose/Sanctuary ceiling adjustments complete

Leave a Reply

Your email address will not be published. Required fields are marked *

Media

Mobile App

Events, Video, Online Giving
Available on the App Store and Google Play Store.
Learn More

Live Stream

Watch Sunday Mass Live
Watch All Saints Mass live every Sunday at 9am PST.
Watch Live

Past Messages

Watch previously recorded Services
Watch last week's Mass, search by topic or Holy Day.
Mass Archive